General Search
Multiple search words are automatically linked with "AND". Text enclosed in quotation marks (") returns only the pages in which this text occurs exactly. With the search filters next to the results you have the possibility to further limit your search.
-
Enhanced Contingency Solution (ECONS II) UDFS – Version R2024.NOV (mit Änderungsmarkierungen / with revisions)
4 MB, PDF
-
NACE Rev. 2 zu NACE Rev. 2.1 Überleitungstabellen und aktuellste Version der Beschreibung der Gliederungsebenen zur NACE Rev. 2.1
No English translation available
-
-
-
-
-
Methodische Informationen - Index of orders received in the construction sector
137 KB, PDF
-
Lukas stellt die Anlagentechnik der Bundesbank vor 100 Tage, 100 Wochen, 100 Monate
09.11.2022 No English translation available
In einem Interview spricht Lukas Spiegel, Gruppenleiter der Versorgungstechnik bei der Bundesbank, über aktuelle Herausforderungen und was die Arbeit in seinem Team mit sich bringt.
-
Eurosystem Single Market Infrastructure Gateway UDFS – Version R2024.NOV (mit Änderungsmarkierungen / with revisions)
3 MB, PDF
-
-
Does an annual report have to be submitted by an independent auditor?
-
What are the conditions for the usage of credit claims in case of a longer-term TARGET incident?
-
Time series
-
Zeitreihen
-
Does the TARGET-Contingency-Pool for ECONS collateral have to be audited annually by an auditor?
-
How do I handle a credit claim that has been repaid in full prematurely?
-
-
Exchange rates, euro foreign exchange reference rates, other rates
The Bundesbank's exchange rate statistics represent a collection of current and historical exchange rates.
-
Wie „privat“ wäre ein digitaler Euro?
No English translation available
-
Bundesbank-Symposium 2022 - Bankenaufsicht im Dialog
04.11.2022 No English translation available
Am 8. November 2022 diskutierten Vertreterinnen und Vertreter der Kreditwirtschaft, Wissenschaft und Bankenaufsicht über die Themen Zinswende, Weiterentwicklung des Meldewesens und operationelle Resilienz. Die Vorträge von Bundesbank-Präsident Dr. Joachim Nagel, Bundesbank-Vorstandsmitglied Prof. Dr. Joachim Wuermeling, dem Vorsitzenden des Aufsichtsgremiums der EZB, Andrea Enria und die Podiumsdiskussion zum Thema „Zukunft der Banken angesichts steigender Zinsen“ wurden live im Internet übertragen.
-
-
-
RTL Nachtjournal Spezial: Bundesbankpräsident Joachim Nagel im Interview
No English translation available
-
Cash centre project – key elements for success (4/5)
This online course is aimed at experienced experts or executives from cash departments wishing to expand their knowledge. There will be the opportunity to learn more about building a project team for a revamping programme, particularly a cash centre, with emphasis on planning and decision-making.
-
-
Durchführungsverordnung (EU) 2024/2011 des Rates vom 22. Juli 2024 zur Durchführung der Verordnung (EU) 2016/44 über restriktive Maßnahmen angesichts der Lage in Libyen 23.07.2024 | Amtsblatt der Europäischen Union, Serie L
No English translation available
-
How do I submit credit claims which have not been issued under German contract law?
-
How is the wording “separate” safe custody of borrowers’ notes to be interpreted?
-
Which attribute in the AnaCredit report is equivalent to the “observed agent identifier”?
-
Which address has to be used for the “paying agent” when entering the data in MACCs?
-
What is the difference between PSE1- and PSE2-debtor?
-
Does the paying agent need to be entered only for consortium loans, or only for claims against borrowers‘ notes?
-
When will a submitted credit claim be processed? When is the credit claim value credited in the collateral account?
-
Does the registered office of the lead arranger or agent matter when counting involved jurisdictions? This is important for third-country branches.
-
When entering the addresses of facility agents, is the address entered in the commercial register sufficient, or must the address be as accurate as possible?
-
Does AnaCredit data have to be provided with the new submission of a credit claim?
-
Does a credit claim have to be collateralised for it to be submitted in MACCs?
-
-
Can the contract identifier and the instrument identifier be identical for the AnaCredit identifiers?
-
Is it possible to submit a consortium member’s share in a consortium loan as a separate credit claim?
-
Does the paying agent need to be entered for all claims against borrowers‘ notes, regardless of whether or not a consortium relationship exists?
-
Is the consortium loan be entered as “Yes” in MACCs for each claim against borrowers´ note?
-
When submitting a new credit claim, under what circumstances should the consortium loan checkbox be activated by selecting “yes”?
-
What is meant by the regulation in the Terms and Conditions which states that the Bank must be informed promptly of any changes to credit claims (e.g. repayments, partial repayments, maturity)?
-
How do I handle a credit claim that has been repaid partly (prematurely)?